For buyers reviewing duplex stainless steel, a useful specification connects the service, the approved drawing and the delivered component. This guide examines the purchasing question “Qualifying a New Casting Supplier”. Use it to organize the supplier discussion before approving material, tooling or production.
Key purchasing decisions for duplex stainless steel
Duplex stainless steel combines ferritic and austenitic phases, so chemistry alone does not establish an acceptable casting. Supplier qualification should connect the specified grade, heat treatment, section geometry and inspection evidence. The objective is repeatable production of the required condition, not merely a compliant alloy name.

Review the design and interfaces
Identify the thickest sections and abrupt junctions on the component. Discuss how the foundry will achieve the required treatment throughout the geometry. Keep proposed weld repairs and subsequent thermal operations within the agreed manufacturing plan.
Compare the purchasing options
Use this comparison when reviewing duplex stainless steel against a controlled drawing and purchase specification.
| Purchasing approach | Main implication | What to resolve |
|---|---|---|
| Certificate-only qualification | Reviews a document | May miss process and geometry effects |
| Production-representative qualification | Connects material and manufacturing | Requires an agreed sampling plan |
Select the manufacturing route
Discuss the geometry and material requirements before tooling is frozen. Thick bosses, thin adjoining walls and enclosed regions can need different production attention. The foundry should explain its proposed route and evidence package, while the design authority approves material and acceptance requirements.
For a project involving duplex stainless steel, compare the complete delivered condition before choosing a production route.
Inspection requirements for duplex stainless steel
Agree required chemical, mechanical, microstructural and corrosion-related checks with the design authority. Record where samples come from and when tests occur. The inspection package should demonstrate the ordered requirements without assuming one test proves everything.

Apply the review to a practical case
For a new pump-body supplier, first-article approval should cover production-representative material and processing. A separately prepared display sample cannot establish consistency for a heavier or differently shaped casting.
Define a complete quotation scope
Include the approved casting grade and specification, section geometry, service environment, machining scope and required tests. State the sampling and acceptance basis rather than requesting a generic duplex certificate. Identify proposed substitutions or repairs as items requiring the agreed technical review.
When discussing duplex stainless steel, separate requirements already approved by engineering from options still awaiting review.
For background reading, see IMOA practical guidelines for duplex stainless steels. Use the applicable project specification and approved design for contractual requirements.
Discuss the component with Leierwo
Review Leierwo’s Fundición de acero inoxidable y Fundición de inversión pages, then send the controlled drawing, material and quantity for a component-specific discussion. Ask the quotation to state the manufacturing scope, inspection evidence and any proposed alternatives.
Frequently asked questions
What is the main buying issue with duplex stainless steel?
Duplex stainless steel combines ferritic and austenitic phases, so chemistry alone does not establish an acceptable casting. Supplier qualification should connect the specified grade, heat treatment, section geometry and inspection evidence.
Which design details should be included?
Identify the thickest sections and abrupt junctions on the component. Discuss how the foundry will achieve the required treatment throughout the geometry.
What should inspection cover when evaluating duplex stainless steel?
Agree required chemical, mechanical, microstructural and corrosion-related checks with the design authority. Record where samples come from and when tests occur.
How should the purchasing options be compared?
Compare “Certificate-only qualification” and “Production-representative qualification” against the same finished-part requirements. Key review points are “may miss process and geometry effects” and “requires an agreed sampling plan”, respectively.
What should an inquiry about duplex stainless steel include?
Send the approved cast material specification, model, drawing, fluid and temperature information, required condition and inspection plan.
Categorías de productos
- Piezas de válvulas
- Piezas de la bomba de agua
- Piezas de la caja de cojinetes
- Piezas de fundición a presión
- Productos para bombas de acero inoxidable
- Productos para bombas de hierro fundido
- Piezas de válvulas para automóviles
- Recambios para automóviles
- Piezas de válvulas para uso civil
- Piezas de bomba de vacío KF

¡Comencemos tu próximo proyecto!
Inicie su proyecto con Leierwo
1. Envíe su consulta
2. Cálculo de costes
3. Inicio de la producción
4. Organizar la entrega
PREGUNTAS FRECUENTES
Sí, tenemos una amplia experiencia en el comercio internacional y podemos ayudar a los clientes con el despacho de aduanas de exportación y los arreglos de envío. Aceptamos varios métodos de pago internacionales, incluyendo T/T (transferencia telegráfica), transferencia bancaria y carta de crédito (L/C). Las condiciones de pago se pueden discutir con nuestro equipo de ventas.
Al asociarse con Leierwo, podrá disfrutar de precios competitivos y una calidad superior a la de otros proveedores. Además, ofrecemos una solución integral para entregar piezas acabadas, incluido el mecanizado CNC y el tratamiento de superficies, lo que garantiza un proceso de producción sin fisuras.
Contamos con avanzados equipos de fundición y estrictos sistemas de control de calidad. Nuestra capacidad de producción mensual es considerable y podemos fabricar productos a partir de dibujos o muestras proporcionados por el cliente. Aceptamos tanto pequeños pedidos de prueba como producciones a gran escala.
Nuestros productos cumplen normas internacionales como ASTM, AISI, DIN y JIS. Podemos proporcionar informes de pruebas de materiales y certificaciones pertinentes para garantizar que la calidad del producto cumple los requisitos del cliente.
Seguimos estrictamente el sistema de gestión de calidad ISO 9001 y realizamos múltiples inspecciones a lo largo del proceso de producción, incluidos análisis espectrográficos, pruebas de rayos X, pruebas ultrasónicas y mediciones dimensionales. Estas medidas de control de calidad garantizan que nuestras piezas de fundición cumplen las normas más estrictas.
Sin embargo, somos flexibles y estamos abiertos a discutir sus necesidades específicas.
Nuestro plazo de producción estándar es de 4 a 6 semanas, en función de la cantidad del pedido y la complejidad del producto. Nos esforzamos por acortar los plazos de entrega para satisfacer las demandas de los clientes.
Sí, podemos proporcionar muestras para la inspección de calidad. Los costes de las muestras y los gastos de envío pueden negociarse, y los gastos de las muestras pueden reembolsarse al realizar un pedido formal.